Pond Configuration is Surveyed and Staked.

Excavators Begin Working on First Open Deep Water Pond.

Open Deep Water Pond and Hillock from Fill Construction Concept.

Fill from Pond is Trucked to Build Hillock to Keep Water from Road Ditch.

Grading the Fill Near the Road.
