No Fence Wetlands Reconstruction Started First Week 6/7/2023.

Excavators are Digging Out First Pond, Filling Trucks and Grading Hillock Slopes.
First Pond is Staked Out and Excavation Started.
A Closer View of Wetland Pond Being Dug in the Rich Meadow Soil.
Wider View Shows the Extent of Soil Layers Throughout the Hayfield.
One of the Excavators Digging Pond and Fill Ready to Spread.
The Hayfield Digging Ponds is Easy with this Beast.
Several Feet Tall Pond Fill is Trucked to the Forest Side Slope.
The Piles are Graded and Smoothed as the Pond Fill is Moved.
The Fill is Graded for the Next Truck Loads to Build Up the Hillock.
Beginning of One of the Access Stream Crossings from Forest.

After 100 years plus of Grazing and Haying this meadow is being restored to boggy beaver ponds.